Projects
- Scope of works: fabrication, delivery and erection of support steel structure for Flue Gas Treatment installation (309,5 t) in two lines. Installation of process equipment (1.024,12 t) including reactor, Fabric Filter, Catalyst & Eco, ID Fans, ducts, silos.
- Tonnage of project: 1.333 tons
- Location: Bellegarde-sur-Valserine, France
- Date of realization: 2021
- Scope of works: fabrication, delivery and erection of support steel structure (645 tons) and sheet metal components (ducts, SCR DeNox, silos = 251 tons) and installation of process equipment (ID Fans, Bag House Filters, Mechanical Conveying System, Pneumatic Transport, Tanks, Pumps, Cabinets, Air Production System etc. = 100 tons) for flue gas treatment.
- Final client: EEW Energy from Waste Stapelfeld GmbH
- Tonnage of project: 996 tons
- Location: Stapelfeld, Germany
- Date of realization: 2021/2022
- Scope of works: workshop drawings with connection design, fabrication, delivery and erection of boiler support steel structure for Energy Production Center Chalampe (Waste to Energy plant).
- Tonnage of project: 1.303 tons
- Location: Mulhouse, France
- Date of realization: 2021

- Scope of works: erection of steel structure (1.956 tons) and installation of process equipment (186 tons) for Total Raffinage France
- Tonnage of project: 2.142 tons
- Location: Donges, France
- Date of realization: 2021/2022

- Scope of works: engineering, workshop documentation,fabrication, delivery and erection of a steel structure including strengthening of existing elements, civil works and also delivery and erection of cable ladder elements together with wall and roof cold cladding as a support for new electrical cables to be installed during repair maintenance of the object.
- Tonnage of project: about 180 tons
- Location: iJmuiden, Netherlands
- Date of realization: 2020 / 2021
-
PROJECT KEMSLEY, ENGLAND (UK)
Scope of works: delivery, prefabrication and erection of pipelines and installation of equipment.
Tonnage of project: 69,7 tons of piping, 7 tons of support structure, 14,1 tons of equipment.
Location: Kemsley, England

- PROJECT EARLS GATE IN SCOTLAND (UK)
Assembly of a flue gas treatment unit and the support structure (200 tons) along with the installation of equipment: flue gas ducts, a bag filter, silos, fans and conveyors (254 tons). Project implemented in 2020.
- PROJECT RAMBERVILLERS (FRANCJA)
Assembly of a support structure for the boiler (428 tons) and a flue gas treatment unit (182 tons). Installation of equipment (284 tons): ducts, a bag filter, an SCR reactor, fans, silos or mechanical conveyors. Project implemented in 2020.
- PROJECT AALEN-NEUKOCHEN (DE)
Workshop project, delivery and assembly of steel structures (805 tons) for the boiler room in the paper mill, Aalen-Neukochen, Germany.

- Workshop project, delivery and assembly of steel structures along with a casing for the wall and the roofs of a technological installation (1,100 tons) for the transportation of metallurgical materials to Amsterdam, the Netherlands

- Workshop project, delivery and assembly of steel structures for the boiler room in Annecy, France (130 tons)

Delivery of steel structures for the boiler in Hooton, UK (470 tons)
- Scope of works: Assembly of steel structure for turbine and boiler building, LuVo, SCR and other auxiliary buildings in total tonnage of 4.500 tons. Installation of process equipment: preheater LuVo, SCR, coal mill, flue gas ducts.
- LuVo: 160 tons
- SCR and channels: 300 tons
- Coal mill: 400 tons
- Location: Pulawy, Poland
- Date: 2020-2021
- Client: Grupa Azoty Puławy (Poland)
Scope implemented by Polimex Energetyka:
- assembly of steel structures (4,200 tons)
- assembly of technological devices (250 tons)
- assembly of light casings (10,500 m2)
- assembly of technological pipelines (800 tons)
Scope implemented by Polimex Energetyka:
- assembly of steel structures (400 tons)
- integration and assembly of ducts (400 tons)
- dismantling of ducts (150 tons)
- assembly of technological devices (52 tons)
- assembly of technological pipelines (55 tons)
Scope implemented by Polimex Energetyka:
- assembly of steel structures (450 tons)
- assembly of technological devices (520 tons)
- assembly of light casings (800 m2)
- assembly of technological pipelines (220 tons)
EPC
Supply and installation of two turbine generator sets with a capacity of 100 MWe each, along with design and accompanying work in the Żerań CHP. Client: the Power Plants in Warsaw SA (PGNiG Termika SA). Contract value: PLN 140 million Tz11 + PLN 171 million Tz12.
Implementation of Wet Flue Gas Desulphurization Installation in the Power Plant Rybnik. Client: Power Rybnik. Value of the contract: PLN 228 million.
Construction of the installation of renewable energy production based on biomass in the CHP Bialystok SA. Client: CHP Bialystok SA. Contract value: PLN 85 million.
Construction of a new Water Treatment Plant in the Nitrogen Plant in Kędzierzyn. Contract value: PLN 63 million.
Coaling plant construction in Belchatow. Client: SANDVIK Mining and Construction. Contract value: PLN 83.8 million.
Design, construction, supply of machinery and equipment, and installation of a complete Flue Gas Desulphurization block No. 10 - 500 MW. Client: "Kozienice" SA Power Plant (ENEA Production SA). Contract value: PLN 75.5 million.
Construction of a new power unit with a fluidized bed boiler, backpressure turbine, two peak boilers and heat accumulator in the Bielsko-Biala EC1 Power Plant. Client: PKE SA. Contract value: PLN 409.7 million.
Construction of a catalytic denitrification plant for OP-430 block boilers No. 10, 14, 15 and OP-380 boiler No. 11 in Siekierki. Client: Vattenafall Heat Poland SA (PGNiG Termika SA). Contract value: PLN 140 million.
Professional assembly
PLN Pressure part assembly in two boilers with a capacity of 1100 MW at Neurath. Client: Hitachi Power Europe, Alstom Power Boiler. Contract value: PLN 107.1 million.
Pressure part assembly in a boiler within the package No. 1,2,4,5 for a block of 858 MW in the Belchatow power plant. Client: ALSTOM Power Sp. z o. o. and RAFAKO SA. Boiler Factory. Contract value: PLN 59.5 million.
Foreign contracts
PLN PAPER MILL IGGESUND, SWEDEN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Net value of the contract: PLN 31 million.
WASTE TO ENERGY PLANT, HELSINGBORG, SWEDEN. Scope of works: supply and erection of steel structure and channels (c. 1800 tons), installation of a boiler (about 800 tons), delivery and installation of piping (about 150 tons), installation of process equipment. Client: Babcock & Wilcox Vølund A/S, NCC Construction Sverige AB. Value: PLN 38.8 million.
IGNIS POWER PLANT, SPREMBERG, GERMANY. Scope of works: supply and installation of steel structures. Client: Baumgarte Boiler Systems GmbH. Value: PLN 15.2 million.
PULP MILL ENCE, HUELVA, SPAIN. Scope of works: supply and installation of steel structures with walls and roof construction. Client: Andritz Oy. Value: PLN 13.9 million