Reference
- Delivery and assembly of steel structures, flue gas ducts and an SCR reactor for the construction of a flue gas catalytic denitrogenation installation for the AP-1650 boilers No 9 and 10 along with the modernization of electrostatic precipitators for Enea Wytwarzanie Sp. z o.o.
Scope of work: delivery and assembly of a steel structure and ducts (3,452 tons)
Client: Rafako S.A.
Contract value: approx. PLN 60 million.
- Prefabrication and assembly of a steel structure within the following assignment: “Construction of a 596 MW gas and steam power unit for PKN Orlen in Płock”.
Scope of work: delivery and assembly of a steel structure (3,500 tons), delivery and assembly of a casing for the wall and the roofs (27,320 m2).
Client: Siemens Sp. z o.o.
Contract value: PLN 42 million.
- Assembly of a steel structure within the following project: "Construction of a 910 MW power unit at the Jaworzno Power Plant III - Power Plant II”
Scope of work: delivery and assembly of a steel structure and ducts (15,000 tons)
Client: Zamet Industry and Stal-System S.A.
Contract value: approx. PLN 20 million.
Selected projects implemented by the Companies that constituted Polimex Energetyka Sp. z o.o. before its consolidation in 2014::
- Implementation of construction and assembly works for the IOS IV (a flue gas desulphurisation installation) for the power units 1-8 at the Kozienice Power Plant.
Client: Babcock-Hitachi Kabushiki Kaisha S.A., branch in Poland.
Contract value: PLN 63.9 million. - Design, delivery and a turnkey installation of a flue gas catalytic denitrogenation system for the boilers at the CHP Plant in the Production Plant of PKN Orlen S.A. in Płock.
Client: PKN Orlen S.A.
Contract value: PLN 378.4 million - Renovation and modernization of the main steam and water pipeline system for the power units 7-12 at the Bełchatów Power Plant
Client: PGE Górnictwo i Energetyka Konwencjonalna SA.
Contract value: PLN 293,97 million - Connection of the power units 5, 6 and 8 to the wet flue gas desulphurisation for EDF Polska S.A., the Rybnik branch.
Client: EDF Polska S.A.
Contract value: PLN 22.6 million. - Delivery and assembly of two 100 MW turbine sets, along with the design and accompanying works at the Żerań CHP Plant.
Client: Elektrociepłownie Warszawskie S.A. (PGNiG TERMIKA S.A.).
Contract value: PLN 140.00 million Tz11 + PLN 171 PLN Tz12. - Implementation of a wet flue gas desulphurisation installation at the Rybnik Power Plant.
Client: Elektrownia Rybnik S.A.
Contract value: PLN 228 million. - Construction of an installation for the production of electricity from renewable energy sources based on biomass at the Białystok CHP Plant.
Client: Elektrociepłownia Białystok S.A.
Contract value: PLN 85 million. - Construction of a new water treatment station for the nitrogen plant in Kędzierzyn
Client: Zakłady Azotowe Kędzierzyn S.A.
Contract value: PLN 63 million. - Construction of a carburation installation at the Bełchatów Power Plant.
Client: SANDVIK Mining and Construction.
Contract value: PLN 83.8 million. - Design, construction and assembly of machines, devices and equipment, as well as assembly of a complete flue gas desulphurisation installation for the power unit 10 (500 MW).
Client: Elektrownia Kozienice S.A. (ENEA Wytwarzanie S.A.).
Contract value: PLN 75.5 million.
- 900 MW power unit in Mannheim, Germany.
Scope of work: assembly of a steel structure and ducts (25,000 tons)
Client: Alstom Power Service.
Contract value: PLN 55 million. - Paper mill in Iggesund, Sweden.
Scope of work: delivery and assembly of a steel structure along with a light casing of the walls and roofs.
Client: Andritz Oy.
Contract value: PLN 31 million. - Filborna waste-to-energy plant, Helsingborg, Sweden
Scope of work: delivery and assembly of a steel structure and ducts (approx. 1,800 tons), assembly of the boiler (approx. 800 tons), delivery and assembly of pipelines (approx. 150 tons), assembly of technological devices.
Client: Babcock & Wilcox Vølund A/S, NCC Construction Sverige AB.
Contract value: PLN 38.8 million. - Ignis Power Plant, Spremberg, Germany.
Scope of work: delivery and assembly of a steel structure of the boiler.
Client: Baumgarte Boiler Systems GmbH.
Contract value: PLN 15.2 million. - Pulp Mill Ence, Huelva, Spain
Scope of work: delivery and assembly of a steel structure along with a light casing of the walls and roofs.
Client: Andritz Oy.
Contract value: PLN 13.9 million. - Paper mill in Workington, UK
Scope of work: delivery and assembly of a support structure of the boiler. Weight of the structure: 1,135 tons. Assembly and installation of a casing (6,000 m2).
Client: Andritz Oy. - Incineration plant in Luzern, Switzerland.
Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler and the flue gas treatment installation. Weight of the structure: 1,550 tons.
Client: Hitachi Zosen Inova AG. - Incineration plant in Vantaa, Finland.
Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler. Weight of the structure: 2,000 tons. - Incineration plant in Plymouth, the United Kingdom. Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler. Weight of the structure: 1,760 tons.
Client: Baumgrate Boiler Systems GmbH. - Incineration plant in Severnside, Bristol, UK.
Scope of work: workshop documentation, delivery and assembly of a support structure of the boiler and the flue gas treatment installation, assembly of equipment (coarse assembly) of, inter alia, a bag filter, fans, air heaters, ducts, pumps, chutes, tanks, etc. Weight of the structure: 2,800 tons
Client: Hitachi Zosen Inova AG.
- Repairs of OP 650 boilers and auxilary systems in EDF Rybnik SA
- Capital overhauls of ancillary equipment of OP 650EDF boilers in EDF Rybnik SA
- General repairs of water boilers for the Energy Company "Jastrzębie" SA
- Repairs of pressure parts of WP-70 boilers in PEC Gliwice Sp. z o. o.
- Repair of an OOG-420 boiler No. 7, built at the Boiler Division of the Power Plant of the Polish Oil Concern ORLEN SA in Plock
- Repairs of boiler drums with a capacity of 210t/h, 1520t/h in the Skawina SA CHP; the Krakow SA CHP; the Kozienice CHP; the Stalowa Wola CHP.
- Modernization of OP650 boilers - prefabrication and installation of a hot hopper and II, III and V of the first stage of superheating in the "Rybnik" SA Power Plant
- Modernization of WR-25 boilers in the EC Pniówek Energy Company "Jastrzębie" SA
- Modernization of a dry FGD installation with moisturizing in "Rybnik" SA Power Plant
- Modernization of electrostatic precipitators of Units No. 1,4,5,6 and 7 in the "Rybnik" SA Power Plant
- Modernization of Units No. 4 and 6 with a capacity of 120MW in the Siersza SA Power Plant and participation in the execution of a semi-dry Flue Gas Desulphurization installation in the Siersza SA Power Plant
- Reconstruction of power units No. 1 and 2 in the Siersza Power Plant - high-pressure and low pressure steam and hot water pipelines with fittings, equipment and auxiliary systems.
- Modernization of the evaporator of OP-380 boilers No. 1 and 2, with a capacity of 380t/h in the Krakow SA Power Plant in order to reduce NOx emissions
- Adaptations of limestone milling units into coal installations with burners and OFA nozzles and coal bunkers in the "Rybnik" SA Power Plant
- Modernization of track bed steel structures, 396 m in length, for repair overhead cranes SM-l, SM-2, SM-3 in the nave of the turbine hall of the main building at EDF Rybnik SA
- Prefabrication, delivery and installation of complete piping and an overflow tank for the EC1 CHP in Bielsko-Biala
- Mechanical installation of the boiler and external piping in Strangnas Energie AB (Sweden)
- Disassembly and assembly of OP-210M boilers with a capacity of 210t/h in the Skawina SA Power Plant
- Erection of CFB 72.2 kg/s boilers for PKE SA - Jaworzno II Power Plant
- Erection of three FM-120-97 BABCOCK boilers with a capacity of 120t/h with piping and an RS station in the Tyre Company in Dębica
- Prefabrication and installation of pipelines on the Distillation II installation in RN LOTOS in Gdansk
- Prefabrication, delivery and installation of technological pipelines, with an installation of technological equipment and fittings; erection of outdoor water tanks and the prefabrication, delivery and installation of support structures - flyovers, along with the prefabrication, delivery and installation of external piping for the task "Construction of a new Water Treatment Plant (WTP) in the Nitrogen Plant in Kędzierzyn
- Prefabrication of pipelines, support structures and installation of technological equipment for pipelines of the installation for the production of liquid CO2 for Messer Poland Sp. z o. o.
- Prefabrication and construction of the ZSR1 tank to achieve the rated capacity of the unloading, storage, transportation installation and the preparation of biomass for Units No. 1-4 in the "Rybnik" SA Power Plant
- Prefabrication and delivery of steam superheater coils (I° and III°) for the OP-650 and AP-1650 boilers in the "Kozienice" Power Plant
- Prefabrication and delivery of boiler flue gas ducts for the AP-1650 in the "Kozienice" Power Plant
- Prefabrication and delivery of a boiler slag hopper for the AP-1650 No. 9 in the "Kozienice" Power Plant
- Prefabrication and delivery of the ECO boiler water heater coils, 460 MW for the "Pątnów II" Power Plant
- Prefabrication and delivery of the superheater coils III° for an OP-230 boiler in the "Skawina" Power Plant
- Prefabrication and delivery of superheater coils for PAK Konin
- Prefabrication and supply of pressure parts of RH1 and ECO boilers, 833 MW in BOT Belchatow (approx. 2.660t)
- Prefabrication and delivery of the primary steam superheater III ° to OP650 boiler for the "Kozienice" Power Plant
- Prefabrication and delivery of steam superheaters for OP-650 boilers for the "Kozienice" Power Plant
- Prefabrication and delivery of a water heater for the Reno Nord project (according to the requirements of Directive 97/23/EC) for Babcock & Wilcox Volund ApS
- Fabrication and replacement of a water heater for the OP-215 boiler No. 3 in the Nitrogen Plant "Pulawy" SA
- Prefabrication and delivery of superheater elements for the OP-430 boiler in the Siekierki Power Plant
- Prefabrication and delivery of steam superheater pipe elements for the OP-380 boiler in the "Stalowa Wola" SA Power Plant